References

References

Photon Energy Operations delivers O&M services for over 250 MWp of solar power plants in 10 countries on two continents.

Have a look at some of the installations in our O&M portfolio:

 

Komorovice, Czech Republic, ground-mounted, 2 354.28 kWp 

Zoom gallery

Installed capacity:2 354.28 kWp
Annual production:2 065 900 kWh
Annual CO2 savings:1 963 t
Grid connection date:December 2010
Location:Komorovice u Humpolce
Technology:Aide XZST - 230 Wp poly,
SMA SMC 11000TLRP a Solaron 500E
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations s.r.o.

  

Radvanice, Czech Republic, ground-mounted, 2 305 kWp

Installed capacity:2 305 kWp
Annual production:2 031 700 kWh
Annual CO2 savings:1 930 t
Grid connection date:December 2010
Location:Přerov
Technology:Stream SE230 P-20/Ac and SE250M - 33/D, STP 17000TL
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Zvíkov 1, Czech Republic, ground-mounted, 2 031.36 kWp 

Zoom gallery

Installed capacity:2 031.36 kWp
Annual production:1 826 700 kWh
Annual CO emission savings:1 735 t
Grid connection date:November 2010
Location:Southern Czech Republic
Technology:Aide XZST – 230 Wp poly, Solaron 500E
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Dolní Dvořiště, Czech Republic, ground-mounted, 1 640.44 kWp 

Zoom gallery

Installed capacity:1 640.44 kWp
Annual production:1 508 500 kWh
Annual CO2 savings:1 433 t
Grid connection date:December 2010
Location:Southern Czech Republic
Technology:SunWell WD-A-CC-0870 95 Wp
and WD-A-CC-087A 100 Wp a-Si,
Aide XZST-185 Wp mono,
SMA SMC 7000HV and 11000TLRP
General contractor:Photon Engineering s.r.o.
Operations & maintenance: Photon Energy Operations CZ s.r.o.

 

Onyx 1, Czech Republic, ground-mounted, 1 498.5 kWp 

Zoom gallery

Installed capacity:1 498.5 kWp
Annual production:1 270 200 kWh
Annual CO emission savings:1 207 t
Grid connection date:December 2010
Location:Zdice, Bohemian region
Technology:Aide XZST -185 Wp mono, STP 17 000TL
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Onyx 2, Czech Republic, ground-mounted, 1 498.5 kWp 

Zoom gallery

Installed capacity:1 498.5 kWp
Annual production:1 270 200 kWh
Annual CO emission savings:1 207 t
Grid connection date:December 2010
Location:Zdice, Bohemian region
Technology:Aide XZST -185 Wp mono, STP 17 000TL
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Drnov, Czech Republic, ground-mounted, 1 494.54 kWp

Installed capacity:1 494.54 kWp
Annual production:1 344 540 kWh
Annual CO emission savings:1 277 t
Grid connection date:October 2010
Location:Central Czech Republic
Technology:Yingli YL 230 Pb-2, 230Wp poly, LTI 550
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Svatoslav, Czech Republic, ground-mounted, 1 231.2 kWp 

Zoom gallery

Installed capacity:1 231.2 kWp
Annual production:1 126 900 kWh
Annual CO emission savings:1 071 t
Grid connection date:December 2010
Location:Svatoslav u Třebíče
Technology:SunWell WD-A-CC-087A 100, SMA SMC 7000HV
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Slavkov, Czech Republic, ground-mounted, 1 159.2 kWp 

Zoom gallery

Installed capacity:1 159.2 kWp
Annual production:1 043 280 kWp
Annual CO emission savings:991 t
Grid connection date:December 2010
Location:Slavkov u Brna
Technology:Aide XZST - 230 Wp poly, SMA SMC 10000TLRP
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Sychrov, Czech Republic, ground-mounted, 1 026 MWp 

Zoom gallery

Installed capacity:1 026 MWp
Annual production:943 920 kWh
Annual CO2 savings:897 t
Grid connection date:December 2009
Location:Sychrov, Central Bohemia
Technology:Gloria GSM6 230 Wp poly, SMA SMC 11000TL
General contractor:Photon Engineering s.r.o.
Investor:Photon SPV 7 s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Chlum, Czech Republic, ground-mounted, 999.81 kWp 

Zoom gallery

Installed capacity:999.81 kWp
Grid connection date:January 2011
Location:Chlum, Pilsen region
Technology:Sopray SR-156P-230, Ingecon Sun 470 TL
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Prša I, Slovakia, ground-mounted, 999.775 kWp 

Zoom gallery

Installed capacity:999.775 kWp
Annual production:1 014 350 kWh
Annual CO2 savings:254 t
Grid connection date:December 2010
Location:Central Slovakia
Technology:SunWell WD-A-CC-870, SMA SMC 7000HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Myjava, Slovakia, ground-mounted, 999.325 kWp 

Zoom gallery

Installed capacity:999.325 kWp
Annual production:1 059 125 kWh
Annual CO2 savings:265 t
Grid connection date:June 2011
Location:Myjava, Myjava region
Technology:AIDE SolarXZST230W, CEEG 235-60P,
SMA SMC 6000A, 8000TL
General contractor:Photon Engineering Slovakia, s.r.o
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Markvartice, Czech Republic, ground-mounted, 999.3 kWp 

Zoom gallery

Installed capacity:999.3 kWp
Grid connection date:December 2010
Location:Markvartice v Podještědí, Northern Bohemia
Technology:Sopray SR-156P-230, Ingecon Sun 470 TL 
Operations & maintenance:      Photon Energy Operations CZ s.r.o.

 

Polianka, Slovakia, ground-mounted, 998.325 kWp 

Zoom gallery

Installed capacity:998.325 kWp
Annual production:998 180 kWh
Annual CO2 savings:250 t
Grid connection date:June 2011
Location:Polianka, Myjava region
Technology:NexPower NT 145AX, SMA SMC 7000 HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Verrone, Italy, rooftop, 992.64 kWp 

Zoom gallery

Installed capacity:992.64 kWp
Annual production:1 091 904 kWh 
Annual CO2 savings:524 t
Grid connection date:June 2012
Location:Verrone in Biella province
Technology:   Yingli YL 235P-29b-PC, GEFRAN- RADIUS 250
General contractor:Photon Engineering s.r.l.
Operations & maintenance:Photon Management s.r.l.

 

Ellrich, Germany, ground-mounted, 988 kWp 

Zoom gallery

Installed capacity:988 kWp
Annual production:976 973 kWh
Annual  CO emission savings:586 t
Grid connection date:August 2012
Location:Ellrich, Thuringia region
Technology:CEEG 245-60M, SMA SMC 11000TLRP
General contractor:Photon Engineering Deutschland GmbH
Operations & maintenance:Photon Energy Operations DE GmbH

 

Jovice V, Slovakia, ground-mounted, 978.75 kWp 

Zoom gallery

Installed capacity:978.75 kWp
Annual production:978 207 kWh
Annual CO2 savings:245 t
Grid connection date:June 2011
Location:Jovice, Rožňava region
Technology:NexPower NT – 145AX, SMA SMC 7000HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Jovice VI, Slovakia, ground-mounted, 978.75 kWp 

Zoom gallery

Installed capacity:978.75 kWp
Annual production:978 207 kWh
Annual CO2 savings:245 t
Grid connection date:June 2011
Location:Jovice, Rožňava region
Technology:NexPower NT – 145AX, SMA SMC 7000HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Mokrá Lúka II, Slovakia, ground-mounted, 962.925 kWp 

Zoom gallery

Installed capacity:962.925 kWp
Annual production:1 058 348 kWh
Annual CO2 savings:265 t
Grid connection date:June 2011
Location:Mokrá Lúka, Revúca region
Technology:Aide Solar AD 185M5-Aa,
SMA SMC 10000 TL and 8000TL
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Mokrá Lúka III, Slovakia, ground-mounted, 962.925 kWp 

Zoom gallery

Installed capacity:962.925 kWp
Annual production:1 058 348 kWh
Annual CO2 savings:265 t
Grid connection date:June 2011
Location:Mokrá Lúka, Revúca region
Technology:Aide Solar AD 185M5-Aa, SMA SMC 1000 TL and 8000TL
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Mostkovice SVP3, Czech Republic, ground-mounted, 795 kWp + 131.04 kWp 

Zoom gallery

Installed capacity:795 kWp + 131.04 kWp
Annual production:750 000 kWh + 117 936 kWh
Annual CO2 savings:713 t + 112 t
Grid connection date:December 2009 + December 2010
Location:Mostkovice, Moravia
Technology:Yingli YGL 235P-29b 230 Wp poly,
SMA SMC 11000TL
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Babiná II, Slovakia, ground-mounted, 925.8 kWp 

Zoom gallery

Installed capacity:925.8 kWp
Annual production:1 019 709 kWh
Annual CO2 savings:255 t
Grid connection date:December 2010
Location:Central Slovakia
Technology:SunWell WD-A-CC-087A, SMA SMC 7000HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance: Photon Energy Operations SK s.r.o.

 

Babiná III, Slovakia, ground-mounted, 924 kWp 

Zoom gallery

Installed capacity:924 kWp
Annual production:1 022 131 kWh
Annual CO2 savings:256 t
Grid connection date:December 2010
Location:Central Slovakia
Technology:SunWell WD-A-CC-087A, SMA SMC 7000HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Milčice, Czech Republic, ground-mounted, 911 kWp 

Zoom gallery

Installed capacity:911 kWp
Annual production:835 952 kWh
Annual CO emission savings:794 t
Grid connection date:July 2009
Location:Milčice, Central Bohemia
Technology:Aide XZST - 180 Wp mono, SMA SMC 9000
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Brestovec, Slovakia, ground-mounted, 850 kWp 

Zoom gallery

Installed capacity:850 kWp
Annual production:888 122 kWh
Annual CO2 savings:222 t
Grid connection date:June 2011
Location:Brestovec, Myjava region
Technology:Yingli Solar–YL250C–30b, SMA SMC 8000 TL and 11000TLRP10
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Zahořany, Czech Republic, ground-mounted, 758 kWp 

Zoom gallery

Installed capacity:758 kWp
Annual production:697 360 kWh
Annual CO emission savings:662 t
Grid connection date:December 2009
Location:Zahořany, Central Bohemia
Technology:Gloria GSM6 230 Wp and 235 Wp poly, SMA SMC 11000TL
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Blatná, Slovakia, ground-mounted, 698.88 kWp 

Zoom gallery

Installed capacity:698.88 kWp
Annual production:746 012 kWh
Annual CO2 savings:187 t
Grid connection date:December 2010
Location:Western Slovakia
Technology:NexPower NT-140AX, SMA SMC 7000HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Praha 15, Czech Republic, rooftop, 653.278 kWp 

Zoom gallery

Installed capacity:653.278 kWp
Annual production:587 950.2 kWh
Annual CO2 savings:559 t
Grid connection date:December 2010
Location:Prague
Technology:Solyndra SL-001-173 173 Wp, SL+001+182 182 Wp, Cylindrical CIGS, STP 17000TL, SMC 8000TL
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Louny, Czech Republic, ground-mounted, 499.5 kWp 

Zoom gallery

Installed capacity:499.5 kWp
Annual production:499 550 kWh
Annual CO2 savings:474 t
Grid connection date:December 2010
Location:Ústecký kraj
Technology:Aide XZST–185 Wp mono, SMA SMC 10000 a 11000 TLRP
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Zvíkov 2, Czech Republic, ground-mounted, 496.8 kWp 

Zoom gallery

Installed capacity:496.8 kWp
Annual production:453 700 kWh
Annual CO emission savings:431 t
Grid connection date:November 2010
Location:Southern Czech Republic
Technology:Aide XZST-230 Wp poly, SMA SMC 10 000 TLRP
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Prša II, Slovakia, ground-mounted, 319.2 kWp 

Zoom gallery

Installed capacity:319.2 kWp
Annual production:287 280 kWh
Annual CO2 savings:72 t
Grid connection date:December 2010
Location:Central Slovakia
Technology:SunWell WD-A-CC-870, SMA SMC 7000HV
General contractor:Photon Engineering Slovakia, s.r.o.
Operations & maintenance:Photon Energy Operations SK s.r.o.

 

Strawberry Hills, Sydney, rooftop, 283 kWp 

Zoom gallery

Installed capacity:283 kWp
Annual production:371 500 kWh
Annual CO2 savings352 t
Grid connection date:2014
Location:Cleveland Street, Strawberry Hills, NSW
Technology:Yingli Panda 270Wp Mono
General contractor:Photon Energy Engineering Australia Pty Ltd
Operations & maintenance:Photon Energy Operations Australia Pty Ltd

Verderio, Italy, rooftop, 261 kWp 

Zoom gallery

Installed capacity:261 kWp
Annual production:287 100 kWh
Annual CO2 savings:137 t
Grid connection date:November 2011
Location:Verderio Inferiore, Lecco province
Technology:   Yingli 250 Wp, SMA STP 17000 TL10, 15000 TL10
General contractor:Photon Engineering s.r.l.
Operations & maintenance:Photon Management s.r.l.

 

Mostkovice SVP1, Czech Republic, ground-mounted, 209.61 kWp 

Installed capacity:209.61 kWp
Annual production:188 649 kWh
Annual CO2 savings:179 t
Grid connection date:December 2010
Location:Mostkovice u Prostějova
Technology:Tianwei TW225 (28)P and TW235 (28)P,
SMA SMC 11000TLRP
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Altentreptow riding hall, Germany, rooftop, 155 kWp 

Zoom gallery

Installed capacity:155 kWp
Annual production:117 800 kWh
Annual CO2  emission savings:71 t
Grid connection date:August 2012
Location:Altentreptow, Mecklenburg Vorpommern
Technology:Solyndra SL-001-173, SMA SMC 10000TLRP
General contractor:Photon Engineering Deutschland GmbH
Operations & maintenance:Photon Energy Operations DE GmbH

 

Symonston, Australia, rooftop, 144 kWp 

Zoom gallery

Installed capacity:144 kWp
Annual production:210 240 kWh
Annual  CO emission savings:114 t
Grid connection date:2012
Location:Narrabundah Lane, Symonston, ACT
Technology:AIDE 250Wp Mono
General contractor:Photon Energy Engineering Australia Pty Ltd
Operations & maintenance:Photon Energy Operations Australia Pty Ltd

 

Fyshwick, Australia, rooftop, 140 kWp 

Zoom gallery

Installed capacity:140 kWp
Annual production:204 400 kWh
Annual  CO emission savings:111 t
Grid connection date:2012
Location:Gladstone Street, Fyshwick, ACT
Technology:AIDE 250Wp Mono
General contractor:Photon Energy Engineering Australia Pty Ltd
Operations & maintenance:Photon Energy Operations Australia Pty Ltd

 

Břeclav, Czech Republic, rooftop, 137.2 kWp

Installed capacity:137.2 kWp
Annual production:138 470 kWh
Annual CO2 savings:132 t
Grid connection date:December 2010
Location:Břeclav
Technology:Stream SE240M-33/D and SE250M-33/D, 240Wp and 250Wp, Renesol 240Wp, Aurora 12,5
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Ženské domovy, Czech Republic, rooftop, 76.14 kWp 

Zoom gallery

Installed capacity:76.14 kWp
Annual production:70 048 kWh
Annual CO2 savings:67 t
Grid connection date:December 2009
Location:Prague 5 – Smíchov
Technology:Gloria GSM6 235 Wp poly, SMA SMC 11000TL
General contractor:Photon Engineering s.r.o.
Operations & maintenance:Photon Energy Operations CZ s.r.o.

 

Brandenburg, Germany, rooftop, 75 kWp 

Zoom gallery

Installed capacity:75 kWp
Annual production:57 000 kWh
Annual  CO emission savings:34 t
Grid connection date:August 2012
Location:Brandenburg, Brandenburg
Technology:Solyndra SL-001-173, SMA SMC 8000TL
General contractor:Photon Engineering Deutschland GmbH
Operations & maintenance:Photon Energy Operations DE GmbH

 

Ueckermünde primary school, Germany, rooftop, 45 kWp 

Zoom gallery

Installed capacity:45 kWp
Annual production:38 475kWh
Annual CO emission savings:23 t
Grid connection date:June 2012
Location:Ueckermünde, Mecklenburg Vorpommern
Technology:   Stream SE250M-33/D, SMA SMC 8000TL
General contractor:Photon Engineering Deutschland GmbH
Operations & maintenance:Photon Energy Operations DE GmbH

 

Demmin, Germany, rooftop, 41 kWp 

Zoom gallery

Installed capacity:41 kWp
Annual production:37 000 kWh
Annual CO emission savings:22 t
Grid connection date:June 2012
Location:Demmin, Mecklenburg Vorpommern
Technology:Yingli Solar YL250C-30b, SMA SB 3800
General contractor:Photon Engineering Deutschland GmbH
Operations & maintenance:Photon Energy Operations DE GmbH

 

Ueckermünde upper secondary school, Germany, rooftop, 27 kWp 

Zoom gallery

Installed capacity:27 kWp
Annual production:22 985 kWh
Annual  CO emission savings:14 t
Grid connection date:June 2012
Location:Ueckermünde, Mecklenburg Vorpommern
Technology:Stream SE 250M-33/D, SMA SB 4000TL-20
General contractor:Photon Engineering Deutschland GmbH
Operations & maintenance:Photon Energy Operations DE GmbH